Quantity, Design & Cost Take-off Worksheet
Programmed by Rey Asuncion (Rox Isabela) (Copyright 2026)
Based on Max B. Fajardo Jr.'s Plumbing Design and Estimate and the National Plumbing Code of the Philippines.
This worksheet is a material take-off, cost-estimating, and preliminary design-sizing aid (septic tank, water storage, fixture units) for planning purposes. It is not a substitute for a complete sanitary/plumbing engineering design, an approved plumbing plan, or a permit application.
Septic tank sizing, water storage sizing, fixture unit tallies, and all resulting pipe, fixture, and material quantities generated here must be reviewed, verified, and sealed by a licensed Professional Engineer, Master Plumber, or Sanitary Engineer as required โ before any purchase, construction, or permitting under the National Plumbing Code of the Philippines and applicable local water district and sanitation requirements.
Quantities and design formulas follow Max B. Fajardo Jr.'s Plumbing Design and Estimate and the National Plumbing Code of the Philippines (including the 1959 Sec. 233 standard septic tank size table and Table 7-2 fixture unit values). Codes are periodically revised โ always check your entries against the current NPC edition and any local government or water district amendments in effect for your project.
Septic tank sizing here uses the Fajardo formula and standard-size cross-check only; it does not account for soil percolation rate, water table depth, disposal field sizing, or site-specific setback requirements. Fixture unit tallies do not by themselves determine pipe or stack sizing โ that still requires the full NPC lookup tables and a hydraulic check by a licensed professional.
This tool is provided "as is," without warranty of any kind, express or implied, including but not limited to accuracy, completeness, or fitness for a particular purpose. The programmer and any distributor of this tool assume no liability for damages, losses, code violations, contamination incidents, or safety incidents arising from its use or from decisions made based on its output.
Unit prices, currency, and VAT/tax rates are entered manually by the user. This tool does not fetch or verify live market prices โ always confirm current supplier pricing before finalizing a cost estimate.
All entries stay in your browser for the current session only and are never uploaded anywhere. Use "Save Entries File" to download your data as a file on your own device, and "Load Entries File" to restore it later.
By using this worksheet, you acknowledge and accept the terms above.